How to Choose an Exhibition Stand Builder: 12 Questions to Ask Before You Sign
Your stand builder is the single biggest risk on your trade-show budget. Use these twelve questions on every shortlist — including on us.
Questions about money
- Is the price fixed once I sign, or an estimate? (Only accept fixed.)
- What exactly is excluded — floor space, electrics, drayage, rigging?
- What are the payment milestones and what happens if the show is cancelled?
Questions about capability
- Do you fabricate in-house or subcontract? Where is the workshop nearest to my show?
- Can I see three stands you built at this venue in the last two years?
- Who is my single point of contact from design to dismantle?
- How fast do I get 3D renders — and how many revision rounds are included?
Questions about risk
- Do you carry public liability insurance accepted by the venue?
- Who handles technical drawings and organiser approvals?
- Is a crew on standby during show hours for repairs and refills?
- What is your plan if freight is delayed?
- Will you store and refurbish the stand for my next show?
How Stagehook Global answers
Fixed price, exclusions in writing, 3D renders in 72 hours with two revision rounds, in-house workshops in Frankfurt, Las Vegas and Noida plus partner workshops in Milano and Moscow, venue-accepted insurance, standby crew during show hours, and free storage between shows for repeat clients. 850+ stands delivered across 120+ expos.
FAQ
What should an exhibition stand quote include?
Design and revisions, structure, graphics, lighting, flooring, furniture, transport, installation, show standby and dismantle — with venue fees such as floor space and electrics listed as exclusions.
How far in advance should I book a stand builder?
Four to six months before the show for custom stands; eight to ten weeks minimum for modular rentals.